Skip to main content

Bunker Edging...







Since labour day the weather has been a virtual roller coaster, we have had lots of rain, some sunshine, warm temperatures and a variety of all three in one day. Throughout this weather our staff has been hard at work trying to restore our bunkers to the original shape and size. Over the years turfgrass begins to encroach into the bunkers, especially on the back or low sides. We have been using the pitchfork method to work our way back from the inside edge. The pitchfork is inserted repeatedly moving back from the edge until the original soil edge is found. The edge is then torn back to this soil/sand interface. Then the existing edge is tamped down to force the grass edge down to the sand, therefore reducing the soil lip on the back sides of the bunkers. This creates a more traditional, Stanley Thompson look to the bunker surrounds. As you will notice from the first picture, the red stakes are in place prior to the edging. In the second picture you can see the amount of over growth and shrinking that the bunker has experienced.

Comments

Popular posts from this blog

Bunker construction on # 17

The past few days we have been able to make great strides on the bunker project on #17. All three of the new bunkers have been shaped and drained. Tuesday morning Ian Andrew our consulting golf course architect, will be painting the final contours in the bunkers. We will then install the bunker boards and back fill with topsoil to the new edges. Once the edges are established we will add the new sand and await sod. The rain and snow that we recieved over the last couple of days has had little effect on the rough shaping process. We are hoping for some drier days to complete the fine tuning and sod prepping.

Golf Course Update

As our season slowly comes to a end our department has been working away at year end projects. We installed drainage in a few areas of the practice range and short game area. These areas were perpetually wet and caused turf and aesthetic issues. We have also been chipping away at the bunkers on #17, smoothing out the faces and recreating the grass edges. These bunkers suffered some severe frost heaving in the faces during the winter after they were built. Our team has removed a number of trees and brush from around our maintenance facility to allow some expansion of our operation. We are working away at clearing space to install aggregate bins and sufficient staff parking. This will also allow delivery trucks and semi's to access our facility without any issues. We are also removing the fallen trees and brush from the woodlot on the right side of #16 fairway. This is a challenging area to work as it is a peat bog and remains wet even in the hottest and driest of summers (like 2010)...

Finish Grading on #2 & #12 Tees

With the great weather that we have had the last two days, we were able to get the tees shaped and all of the tee mix out to the tees. In this picture here, Derek Vergeer (our contractor) is finish grading #2 Tee to be ready for sod. Unfortunately the forecast is for rain the next couple of days and could hold us up for a bit. We are doing out best to complete these projects in a timely manner, of course with this blog we will keep you updated.