Skip to main content

Drainage Project Completed...



                                                                  In progress

Yesterday TDS finished phase 1 of our drainage project. The landing areas on  #3, #9 and #13 were completed. During phase 1 new collector drains, catch basins and slit drains were installed. This complete system helps with all avenues of water removal and dispersal. Slit drains pull water in a wide range from both the soil and the surface. In the case of a down pour the new, properly sized catch basins will allow the water to drain off. With the installation of new large diameter collector drains we are able to handle alot of water that the existing drainage, slit drains and catch basins draw in without backing up. We also installed an interceptor drain on #3. This pipe is placed in the side hill to "intercept" any sepage making it's way to the fairway. As you can see from the pictures the equipment and meticulous nature of TDS (once completed) the work areas are neat, clean and very playable. All of the slit drains will be seeded once the settling has subsided. Until grass has grown over the drains they are to be played as Ground Under Repair.

                                                                #9 Completed

Comments

Popular posts from this blog

The Practice Range Tee

Last fall we utilized a “new to us” method of revitilization for our practice tee. Our contractor TDS,  fraize mowed the surface of the tee to remove organic matter as well at to aid in leveling. The tee was then aerified and seeded to a new variety of creeping rye grass. We chose this type of turf grass as research  shows rapid recovery and a low growth habit. We were able to get some great growth in the fall, but the tee is still not ready for traffic and full use. The plan is to utilize the mats until growth has filled in some of the voids etc. We will then begin to slowly set up hitting areas on the grass tee. For a while we will alternate between grass and the mats with a 50/50 ratio of use. Once the grass tee is established and is in adequate recovery mode, the practice areas will be back to normal. As always our membership’s patience is appreciated as we try to improve these areas for use.

Cultural Greens Maintenance...

With the cooler temperatures this week, we will be performing some all important greens maintenance procedures. Monday evening (after the outside event) we will be doing a light grooming on both our greens and collars. This task will help to reduce the amount of lateral growth, therefore standing up the plants (for a better cut) and smoothing out the surfaces. Following the grooming we will be dry mowing all areas tonight to help clean up the debris. Tuesday morning we will be applying our biweekly light topdressing prior to play. Once the sand has dried, we will use our cocoa matt to drag the sand into both the canopy and the shallow grooming channels created by tonight's procedure. These practices in conjunction help to create a smooth, firm and healthy surface to putt on.

Spring Greens Aeration...a week later!

A week has passed since our annual spring greens aeration. We have had a mixed bag of weather, hot, dry, cold, wet and even frost! These conditions make it challenging to aid in healing, but with the more recent consistent warm temperatures we are seeing solid recovery. We were fortunate to have decent weather to complete the process on time, allowing us to fill all the holes created by the 1/2” hollow tines. As there are some minor depressions within some of the holes we will be beginning our bi-weekly topdressing program early next week. Our team is mowing and rolling our greens daily, while slowly lowering our height of cut to our summer norm. We all know that spring cultural practices are not popular among golfers, but these all important tasks are the building blocks for high performance greens conditions throughout the heart of the golf season. Check out this video produced by the USGA on Aerations effect on putting...