                                                                  In progress

Yesterday TDS finished phase 1 of our drainage project. The landing areas on  #3, #9 and #13 were completed. During phase 1 new collector drains, catch basins and slit drains were installed. This complete system helps with all avenues of water removal and dispersal. Slit drains pull water in a wide range from both the soil and the surface. In the case of a down pour the new, properly sized catch basins will allow the water to drain off. With the installation of new large diameter collector drains we are able to handle alot of water that the existing drainage, slit drains and catch basins draw in without backing up. We also installed an interceptor drain on #3. This pipe is placed in the side hill to "intercept" any sepage making it's way to the fairway. As you can see from the pictures the equipment and meticulous nature of TDS (once completed) the work areas are neat, clean and very playable. All of the slit drains will be seeded once the settling has subsided. Until grass has grown over the drains they are to be played as Ground Under Repair.

                                                                #9 Completed

Comments

Popular posts from this blog

Bunker construction on # 17

The past few days we have been able to make great strides on the bunker project on #17. All three of the new bunkers have been shaped and drained. Tuesday morning Ian Andrew our consulting golf course architect, will be painting the final contours in the bunkers. We will then install the bunker boards and back fill with topsoil to the new edges. Once the edges are established we will add the new sand and await sod. The rain and snow that we recieved over the last couple of days has had little effect on the rough shaping process. We are hoping for some drier days to complete the fine tuning and sod prepping.

Golf Course Update

As our season slowly comes to a end our department has been working away at year end projects. We installed drainage in a few areas of the practice range and short game area. These areas were perpetually wet and caused turf and aesthetic issues. We have also been chipping away at the bunkers on #17, smoothing out the faces and recreating the grass edges. These bunkers suffered some severe frost heaving in the faces during the winter after they were built. Our team has removed a number of trees and brush from around our maintenance facility to allow some expansion of our operation. We are working away at clearing space to install aggregate bins and sufficient staff parking. This will also allow delivery trucks and semi's to access our facility without any issues. We are also removing the fallen trees and brush from the woodlot on the right side of #16 fairway. This is a challenging area to work as it is a peat bog and remains wet even in the hottest and driest of summers (like 2010)...

Finish Grading on #2 & #12 Tees

With the great weather that we have had the last two days, we were able to get the tees shaped and all of the tee mix out to the tees. In this picture here, Derek Vergeer (our contractor) is finish grading #2 Tee to be ready for sod. Unfortunately the forecast is for rain the next couple of days and could hold us up for a bit. We are doing out best to complete these projects in a timely manner, of course with this blog we will keep you updated.