Bunker construction on # 17


The past few days we have been able to make great strides on the bunker project on #17. All three of the new bunkers have been shaped and drained. Tuesday morning Ian Andrew our consulting golf course architect, will be painting the final contours in the bunkers. We will then install the bunker boards and back fill with topsoil to the new edges. Once the edges are established we will add the new sand and await sod. The rain and snow that we recieved over the last couple of days has had little effect on the rough shaping process. We are hoping for some drier days to complete the fine tuning and sod prepping.

Comments

  1. Hey Greig

    How far is the bunker or bunkers on 17. Are they only on the west side of the fairway? Also are they positioned to prevent balls going down in the second valley?

    ReplyDelete
  2. Hi Grant, as per the master plan, there is three new bunkers on #17. One is on the left side of the fairway @ approx. 150 yds out from the green. The second is in the hollow on the right positioned in the north face and the third is a greenside bunker on the left (which I believe was once there previously).

    ReplyDelete

Post a Comment

Popular posts from this blog

The Practice Range Tee

Last fall we utilized a “new to us” method of revitilization for our practice tee. Our contractor TDS,  fraize mowed the surface of the tee to remove organic matter as well at to aid in leveling. The tee was then aerified and seeded to a new variety of creeping rye grass. We chose this type of turf grass as research  shows rapid recovery and a low growth habit. We were able to get some great growth in the fall, but the tee is still not ready for traffic and full use. The plan is to utilize the mats until growth has filled in some of the voids etc. We will then begin to slowly set up hitting areas on the grass tee. For a while we will alternate between grass and the mats with a 50/50 ratio of use. Once the grass tee is established and is in adequate recovery mode, the practice areas will be back to normal. As always our membership’s patience is appreciated as we try to improve these areas for use.

Cultural Greens Maintenance...

With the cooler temperatures this week, we will be performing some all important greens maintenance procedures. Monday evening (after the outside event) we will be doing a light grooming on both our greens and collars. This task will help to reduce the amount of lateral growth, therefore standing up the plants (for a better cut) and smoothing out the surfaces. Following the grooming we will be dry mowing all areas tonight to help clean up the debris. Tuesday morning we will be applying our biweekly light topdressing prior to play. Once the sand has dried, we will use our cocoa matt to drag the sand into both the canopy and the shallow grooming channels created by tonight's procedure. These practices in conjunction help to create a smooth, firm and healthy surface to putt on.

Spring Greens Aeration...a week later!

A week has passed since our annual spring greens aeration. We have had a mixed bag of weather, hot, dry, cold, wet and even frost! These conditions make it challenging to aid in healing, but with the more recent consistent warm temperatures we are seeing solid recovery. We were fortunate to have decent weather to complete the process on time, allowing us to fill all the holes created by the 1/2” hollow tines. As there are some minor depressions within some of the holes we will be beginning our bi-weekly topdressing program early next week. Our team is mowing and rolling our greens daily, while slowly lowering our height of cut to our summer norm. We all know that spring cultural practices are not popular among golfers, but these all important tasks are the building blocks for high performance greens conditions throughout the heart of the golf season. Check out this video produced by the USGA on Aerations effect on putting...