This week we began the scheduled renovation of #12 Tee and #2 Tee. On #2 we are extending the Gold/Black Tee forward to accommodate more use and aid in divot recovery. On #12 we are raising and enlarging the Silver/Blue teeing area. The renovation on #12 co insides with the new cart path through the forest on the right hand side. Rough shaping will be completed on Monday (weather permitting). Following the shaping, a sand based growing medium will be added to the surface. Once the grade is set we will re-connect the irrigation in these areas and wait for the sod farms to open (early April). Once the tees are sodded, we will nurture them to encourage rooting and growth. With some good spring weather we should be back playing on those tees in a short time.
As our season slowly comes to a end our department has been working away at year end projects. We installed drainage in a few areas of the practice range and short game area. These areas were perpetually wet and caused turf and aesthetic issues. We have also been chipping away at the bunkers on #17, smoothing out the faces and recreating the grass edges. These bunkers suffered some severe frost heaving in the faces during the winter after they were built. Our team has removed a number of trees and brush from around our maintenance facility to allow some expansion of our operation. We are working away at clearing space to install aggregate bins and sufficient staff parking. This will also allow delivery trucks and semi's to access our facility without any issues. We are also removing the fallen trees and brush from the woodlot on the right side of #16 fairway. This is a challenging area to work as it is a peat bog and remains wet even in the hottest and driest of summers (like 2010)...
Will the back tees connect with the lower tees?
ReplyDeleteGrant, the tees on #2 will still remain as two seperate tees. The gap between them will be smaller.
ReplyDelete