This week we began the scheduled renovation of #12 Tee and #2 Tee. On #2 we are extending the Gold/Black Tee forward to accommodate more use and aid in divot recovery. On #12 we are raising and enlarging the Silver/Blue teeing area. The renovation on #12 co insides with the new cart path through the forest on the right hand side. Rough shaping will be completed on Monday (weather permitting). Following the shaping, a sand based growing medium will be added to the surface. Once the grade is set we will re-connect the irrigation in these areas and wait for the sod farms to open (early April). Once the tees are sodded, we will nurture them to encourage rooting and growth. With some good spring weather we should be back playing on those tees in a short time.
With the great weather that we have had the last two days, we were able to get the tees shaped and all of the tee mix out to the tees. In this picture here, Derek Vergeer (our contractor) is finish grading #2 Tee to be ready for sod. Unfortunately the forecast is for rain the next couple of days and could hold us up for a bit. We are doing out best to complete these projects in a timely manner, of course with this blog we will keep you updated.
Will the back tees connect with the lower tees?
ReplyDeleteGrant, the tees on #2 will still remain as two seperate tees. The gap between them will be smaller.
ReplyDelete